Cockpit rebuild
Home Up Tamarisk Gaff Cutters Links Our Other Boats Scandal For Sale Wind Song

 

Up

 

When we bought the boat the purchase survey highlighted some areas where the plywood in the cockpit needed attention. Most of the problems were around the cockpit sole which was duly removed and thrown away, A couple of new beams were made and some local spots of soft ply were cut out with new ply being epoxied and glassed in. The well was cleaned up and the exhaust hose led in a loop under the aft deck

 

under_cockpit_sole.jpg (274689 bytes)  
View down the hatch in the cockpit sole. Left to right, hoses are exhaust, large bilge pump, water filler, electric bilge pump and small bilge pump.  

 

When the sole and well had been sorted out, the benches and hatches were lifted for a bit of tidying and resealing to the framework and base layer.

 

cockpit_rebuild1.jpg (116855 bytes) cocpit_rebuild1b.jpg (100031 bytes)
Port front with locker, bench and base removed Cleaned, sealed and the base layer put back in.

 

cockpi_rebuild2.jpg (103089 bytes) cockpit_rebuild3.jpg (93894 bytes)
Starboard front showing fuel tank. Port aft with base layer removed

 

cockpit_rebuild4.jpg (110144 bytes)  
Aft with it coming back together